热门标签

新2足球app(www.hg9988.vip):Johor expects RM15bil investment in YTL Green Data Centre Park

时间:1个月前   阅读:17   评论:2

新2足球appwww.hg9988.vip)实时更新发布最新最快最有效的新2足球网址,新2足球app下载,包括新2手机网址,新2备用网址,皇冠最新网址,新2足球网址,新2网址大全。

KULAI: Johor is expecting RM15bil in investment through YTL Green Data Centre Park, which is located here, over the next 10 years, says Mentri Besar Datuk Onn Hafiz Ghazi.

He added that the green data centre park, within 111.2ha, is the largest in the country with 500 megawatt capacity as well as being the first data centre in Malaysia powered by renewable energy.

“The digital economy is expected to contribute 22.6% to the country’s gross domestic product by 2025, and it is a slice of the economy that Johor does not intend to miss.

“In becoming a strong data centre market globally, the state’s potential hinges on multiple factors.

“We have grown into a robust technology hub and a desired location for digital investments. Our status as the current regional hub for manufacturing, logistics and big data analytics is definitely a plus point,” he said in his speech before officiating the ground breaking ceremony of the Sea Data Centre here yesterday.

YTL Power International Bhd, through its subsidiary, YTL Data Center Holdings Pte Ltd, is investing RM1.5bil for the first phase of the YTL Green Data Centre Park.

,

皇冠下载www.hg108.vip)是一个开放皇冠即时比分、皇冠官网注册的平台。皇冠下载(www.hg108.vip)提供最新皇冠登录,皇冠APP下载包含新皇冠体育代理、会员APP。

,

Onn Hafiz added that the global data centre market was valued at US$187.3bil (RM837.7bil) in 2020 and is projected to reach US$517.1bil (RM2.3 trillion) by 2030, registering a compound annual growth rate of 10.5% from 2021 to 2030.

He also said there was an increasing pattern of data centre providers choosing to locate their facilities outside of the more advanced markets.

“With the continuous assistance of the Malaysian Investment Development Authority, the state government will do its best to attract investments of this nature and enable Johor to realise its potential to become a regional data centre hub,” he added.

The other data centre parks that are based in Johor are the Nusajaya Tech Park and the Sedenak Tech Valley.

Meanwhile, Sea Ltd co-founder and group chief operating officer Ye Gang said YTL would be able to meet the infrastructure, power and connectivity needs of its operations in the region with the state government and Mida as their key expansion partners.

Targeted to be completed by the first quarter of 2024, the green building will feature 24 data hall suites, mechanical and engineering rooms, office space, storage and parking facilities.

YTL Power managing director Datuk Yeoh Seok Hong said the groundbreaking ceremony marked a new phase of its partnership with Sea Ltd.


转载说明:本文转载自Sunbet。

上一篇:usdt公开api接口:IRB: Tax breaks to MNCs no longer appealing

下一篇:天水围将设首间内地课程私校

网友评论