热门标签

皇冠APP下载(www.hg108.vip):TCS bags RM108.38mil construction job for Moxy Hotel

时间:1个月前   阅读:24   评论:3

登1登2登3代理www.99cx.vip)实时更新发布最新最快最有效的登1登2登3代理网址,包括新2登1登2登3代理手机网址,新2登1登2登3代理备用网址,皇冠登1登2登3代理最新网址,新2登1登2登3代理足球网址,新2网址大全。

KUALA LUMPUR: TCS Group Holdings Bhd's subsidiary TCS Construction Sdn Bhd has secured an award from IOI City Hotel Sdn Bhd for the construction of the main building works of Moxy Hotel for RM108.38mil.

In a filing with Bursa Malaysia, the construction firm said the contract will be completed in 16 months form Sept 1, 2022 to Dec 31, 2023.

"The contract is expected to contribute positively to the future earnings and net assets of TCS for

,

皇冠APP下载www.hg108.vip)是一个开放皇冠即时比分、皇冠官网注册的平台。皇冠注册平台(www.hg108.vip)提供最新皇冠登录,皇冠APP下载包含新皇冠体育代理、会员APP。

,

the duration of the contract.

"TCS Group intends to fund the Contract via internally generated funds and/or borrowings," it said.

At 12.30pm, shares in TCS last traded 0.5 sen or 1.85% lower at 26.5 sen a share on the back of 152,600 units traded.


转载说明:本文转载自Sunbet。

上一篇:电报群搜索工具:East Malaysia parties will be kingmakers in GE15, says MCA sec-gen

下一篇:cược chấp la gì(www.84vng.com)

网友评论