热门标签

usdt收款平台(www.trc20.vip):More development projects in Sarawak

时间:2周前   阅读:1   评论:1

usdt收款平台www.trc20.vip)是使用TRC-20协议的Usdt第三方支付平台,Usdt收款平台、Usdt自动充提平台。免费提供入金通道、Usdt钱包支付接口、Usdt自动充值接口、Usdt寄售回收。菜宝Usdt钱包一键生成Usdt钱包、一键调用API接口、一键出售Usdt。

Sarawak Premier Tan Sri Abang Johari Tun Openg (second left) looking through a coffee table book in conjunction with the Sarawak Economic Development Corporation's 50th anniversary celebration on Monday (July 4)(File pic)

PETALING JAYA: The prospects of the construction sector remains bright in Sarawak following more development projects in the pipeline, says MIDF Research.

The state government is projecting a capital injection of RM100bil by 2028 in its efforts to achieve a developed economy status.

“About RM64bil will come from the state’s annual budget, while the state’s energy development company Sarawak Energy Bhd is expected to pump in about RM40bil up to 2026,” said the research house in its note to clients.

This is a conservative estimate by Sarawak as the state’s budget averages about RM10bil annually, said MIDF Research.

In addition, investments that would involve several billion ringgit from Japan-based Sumitomo Corp and South Korea-based Samsung in the state’s first hydrogen plant, are expected to begin construction this year, said the research house.

Sarawak is also focusing to look into “sick projects” that were delayed or abandoned.

MIDF Research said this would mean more infrastructure works are expected to be rolled out in the state.

“About 84 sick projects have been identified in Sarawak and among action plans to tackle them are to appoint rescue contractors.

,

电报搜索botwww.tel8.vip)是一个Telegram群组分享平台,电报搜索bot包括电报搜索bot、Telegram群组索引、Telegram群组导航、新加坡Telegram群组、Telegram中文群组、Telegram群组(其他)、Telegram 美国 群组、Telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。电报搜索bot为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

,

“This could suggest that a number of projects would be retendered – a good opportunity for construction players to replenish their order books,” said the research house.

At the same time, Sarawak remained committed to reimplement projects shelved in 2018.

The research house said tenders for the state-funded second trunk road, which spans 225km, are expected to be called this year, with seven work packages.

“There will be seven more packages next year,” it said, adding that the entire project is estimated at RM5.84bil.

Another closely watched plan is the post Covid-19 development strategy where Sarawak has committed RM63bil for various efforts such as to develop basic infrastructure, namely roads and bridges, water and electricity supply, and telecommunication network.

In June, the state government had said that 7,530km of new roads would be built to connect all rural areas, while 3,487km of roads must be upgraded or rehabilitated.

“This would translate into strong job flows over the long term,” said MIDF Research.

On Tuesday, Sarawak premier Tan Sri Abang Johari Tun Openg said the state government is finalising a programme to assist construction players, which will focus on the prices of raw materials.

“While this is not a massive headwind for most of the companies under our coverage, this is a much-welcomed move for the industry in mitigating the downside risks,” the research house noted.

上一篇:哈希游戏源码出售(www.hx198.vip)

下一篇:以太坊开奖:Malaysia's wholesale, retail trade set new sales record in May 2022

网友评论

  • 2022-09-12 01:34:44

    Bursa Malaysia CEO Datuk Muhamad Umar Swift commented that stakeholder engagement is key in facilitating greater understanding among industry players to enable their participation in the VCM Exchange, and in order to meet ESG requirements required by parties such as lending institutions.难得的好文章呢